Provision of Water Injection Pump(s) to Inject Produced Geothermal Water into the Injection Well at the United Downs Deep Geothermal Power (UDDGP) project, Cornwall, UK.

Geothermal Engineering Ltd (GEL) has launched a Tender for the provision and operation of a number of standalone pumps to continuously (24hrs a day for up to 1 month) inject produced geothermal water at up to 60 litres/second (< 100 deg C and up to 150 bars pressure) from the production well, United Downs-1 (UD-1) into the injection well, United Downs-2 (UD-2) at the United Downs Deep Geothermal Power project located near Redruth in Cornwall, UK.

The project is co-financed by the European Regional Development Fund.  The closing date for the Tender is the 9th February 2021.

For further information and a Tender pack please contact Jonathan Beynon: jonathan.beynon@geothermalengineering.co.uk