NOW CLOSED – Provision of Water Injection Pump(s) to Inject Produced Geothermal Water into the Injection Well at the United Downs Deep Geothermal Power (UDDGP) project, Cornwall, UK.

Geothermal Engineering Ltd (GEL) has launched a Tender for the provision and operation of a number of standalone pumps to continuously (24hrs a day for up to 1 month) inject produced geothermal water at up to 60 litres/second (< 100 deg C and up to 150 bars pressure) from the production well, United Downs-1 (UD-1) into the injection well, United Downs-2 (UD-2) […]

NOW CLOSED – Tender for an ESP installation at the United Downs Deep Geothermal Power (UDDGP) project, Cornwall UK.

Geothermal Engineering Ltd (GEL) has launched a Tender for the supply of unit to install and run an Electrical Submersible Pump at the United Downs project in Cornwall.  The ESP will be installed at a maximum depth of 700m. The project is co-financed by the European Regional Development Fund.  The closing date for the Tender is the 9th February 2021. For further information and […]